Project Overview
Refractory insulation system upgrade for a chemical processing facility. The project focused on improving thermal efficiency and reducing operating costs.
Scope of Work
- Furnace Type: Chemical Reactor
- Operating Temperature: 1100°C
- Insulation Area: 1,200 m²
- Project Duration: 6 weeks
Materials Supplied
Ceramic fiber blankets and boards for comprehensive thermal insulation upgrade.
Performance Improvements
- Heat loss reduced by 25%
- Annual energy savings: $120,000
- Surface temperature reduced by 50°C
- Worker safety: Significantly improved